News - October 15, 2021

Gable End Frame

Gable End Frame fabricated, welded and painted. Ready for despatch to a property having a barn conversion in the Yorkshire Dales .

Gable End Frame 5.8m Span between the frame legs.

George Green (Keighley) Ltd | Water Projects (waterprojectsonline.com)

https://www.georgegreen-uk.com/news

 


We predominantly serve the water industry, supplying all aspects of work including:

  • Carbon or Stainless Pipework: Firstly steel rising main pipework is a core product, comprising flanged spools to customer specifications. Secondly steel water pipe fittings which includes fabricated duckfoot and lobster back bends. Thirdly we can fabricate a competitive range of bespoke tees, reducers and manifolds as an alternative to ductile iron pipework.
  • Bridge Scrapers: The rotating half bridge scraper installation includes, bridge, centre steel tripod, end carriage, diffuser drum and scraper assembly. The half-bridge scraper rotates about a central pivot and the outer end comprises the end carriage which carries the bridge drive and wheel assemblies.
  • Pressurised Storage Containers: We produce a range of pressurised storage and transport containers. And these are for the safe handling of very expensive spare parts (turbine rotors and pump impellors).
  • Galvanised Steelwork: Our workforce includes fully trained fabricators and coded welders. We work to the highest standards to make sure our fabricated metal products and structures meet all specified tolerances. We design, supply and install galvanised steelwork. This includes installation of steel handrails.
  • Expertise – George Green (georgegreen-uk.com)